Home/Services/Construction loans
Services · Construction loans

Build it, and
pay as it rises.

A construction loan releases money to your builder in stages as the house goes up, and you pay interest only on what has been drawn. Lenders value the land plus the fixed-price contract as if the home were finished, lend against that, and usually allow 90 to 95 per cent for owner-occupiers with lenders mortgage insurance, 80 per cent without. We line up the loan, the contract and the valuation so the first progress payment is never the first surprise.

How a build gets paid for in Victoria.

The statutory progress-payment schedule for a full build under the Domestic Building Contracts Act, plus the lending rules that sit on top of it.

5%Maximum deposit a builder can take on a Victorian domestic building contract of $20,000 or moreConsumer Affairs Victoria
10 · 15 · 35Base, frame and lock-up stages as a percentage of the contract price (full build, standard schedule)Consumer Affairs Victoria
25 · 10Fixing stage, then the final 10 per cent on completion, after your inspection and the lender'sConsumer Affairs Victoria
$16kAbove this contract value your builder must hold domestic building insurance and show you the certificate before taking a centConsumer Affairs Victoria
90–95%Typical maximum loan-to-value for an owner-occupier build with LMI; 80 per cent withoutLender policy, varies by lender
12moTypical construction period a lender allows before the loan reverts to principal and interest; extensions on requestLender policy, varies by lender

Figures checked October 2026 against the sources shown. Rules change; we re-check before every application.

How does a construction loan actually work?

The lender approves a total figure for land plus build, then releases it in stages against your builder's invoices, usually after an inspection. You pay interest only on the amount drawn so far, and the loan switches to normal principal-and-interest repayments once the home is complete.

If you already own the land, the loan funds the build only. If you are buying land and building, the land settles first and the construction portion sits undrawn until the builder's first claim. Most lenders allow twelve months for the build and extend if the project runs over, as long as you ask before the deadline rather than after.

Two things lenders will not usually fund: a builder's deposit above the 5 per cent the Act allows, and variations that are not in the fixed-price contract. Both come out of your own pocket, so they belong in the budget from day one.

How much can I borrow to build?

The lender takes the lower of what the project costs (land plus contract) and what a valuer says it will be worth when finished, then lends up to its maximum loan-to-value against that figure. Your income is tested on the full end loan, with the usual 3-percentage-point buffer.

The "as if complete" valuation is where builds go wrong. A high-spec home on a modest street can cost more than it values, and the gap is yours to fund. We get the valuation ordered early, before you are locked in, and we know which lenders are realistic about new estates and which are not.

What do I need before applying for a construction loan?

A fixed-price building contract from a registered builder, council-approved plans and specifications, a certificate of currency for domestic building insurance on any contract over $16,000, and the usual income and deposit evidence.

The contract matters more than people expect. Lenders want a fixed price, the statutory progress schedule or a reasonable alternative, and site costs included rather than listed as "provisional". A cost-plus contract or a builder who is not VBA-registered will stop most lenders cold, and we would rather tell you that before you pay a deposit than after.

  • Registered builder (Victorian Building Authority) for any domestic work over $10,000.
  • Fixed-price contract with site costs and the progress schedule set out.
  • Plans, specifications, soil report and the building permit (or a clear path to one).

Can I use first home buyer schemes to build?

Yes. The $10,000 First Home Owner Grant applies to new homes, including a house-and-land build, up to $750,000, and the Victorian stamp duty exemption applies to the land and contract value for a first home. The First Home Guarantee can also be used for a build within its price cap.

The grant is usually paid at the base-stage progress payment rather than at land settlement, which affects how much cash you need up front. See the first home buyers page for the current thresholds.

What about a knock-down rebuild or a renovation?

Both are construction loans. A knock-down rebuild values the land as vacant plus the contract; a major renovation needs a fixed-price contract and plans just like a new build, while a smaller one can often be funded from equity or redraw without a construction facility at all.

If you are living in the home while it is rebuilt you will need somewhere to live for a year; lenders do not fund rent, so it goes into the budget. If you are demolishing, tell your lender before the bulldozer arrives: the existing loan is secured against a house that is about to disappear.

“We're always looking to find a solution for our clients where other people would just give up.”
Suvidh Arora, MPA, 2022

From contract to keys.

The Cinch five steps, with the valuation ordered early and the progress payments managed for you.

01

Plan and value

Borrowing power, the right lender for the builder and the estate, and an early "as if complete" valuation so there is no gap to find later.

02

Approve and settle land

Formal approval on land plus build. Land settles first if you are buying it; the construction portion waits for the builder.

03

Draw, inspect, complete

Each builder invoice goes to the lender, an inspection follows, the stage is paid. On completion the loan rolls to normal repayments and you move in.

Construction loan questions.

Straight answers. If yours isn't here, ask cinchi (bottom right) or book a chat.

01Do I pay interest during construction?+
Yes, but only on the money drawn so far. In the early stages that is a small fraction of the total loan, so repayments start low and step up as each stage is paid.
02Who pays the builder?+
The lender pays the builder directly against each invoice, usually after inspecting the stage. You approve each claim; nothing is released without your say-so.
03What if the build costs more than the contract?+
Variations and out-of-contract items are yours to fund unless the lender agrees to increase the loan, which needs a revaluation. Keep a buffer of at least 5 to 10 per cent of the contract price in cash.
04Can I build on land I own outright?+
Yes. The land is your deposit, so a construction loan against it is often well under 80 per cent and avoids LMI altogether.
05How long does construction loan approval take?+
Allow two to four weeks from a complete application, including the valuation. Builders' contracts usually give you a finance clause; we make sure the dates line up.
06Do I need a 20 per cent deposit to build?+
No. Owner-occupiers can often build with 5 to 10 per cent plus LMI, and the First Home Guarantee or a family guarantee can remove the LMI. The valuation, not the deposit, is usually the limiting factor.

Often paired with.

All ten services →

Built, paid, settled. A cinch.