Small residential developments are funded against the project, not just your payslip: a bank will typically lend 60 to 70 per cent of total cost with solid presales, a non-bank 70 to 80 per cent with fewer or none, and a private lender more again at a higher rate. We work out which tier your project belongs in, what equity you need, and how the drawdowns, the QS reports and the exit fit together before you commit to the land.
Indicative ranges for small-scale residential projects, from a single broker-platform guide checked this month. Every project prices on its own numbers.
Figures checked October 2026 against the sources shown. Rules change; we re-check before every application.
It depends on which lender tier fits the project. Banks lend around 60 to 70 per cent of total cost and 60 to 65 per cent of the gross realisation value, and want presales. Non-banks stretch to 70 to 80 per cent of cost with light or no presales. Private and stretch-senior lenders go further again, at a higher price. The rest is your equity, usually 20 to 35 per cent of cost.
Two numbers get confused constantly. Loan-to-cost is the loan against what the project costs to build, including land, construction, consultants and interest. Loan-to-value on GRV is the loan against what the finished stock will sell for, net of GST and selling costs. A lender tests both and lends to the lower result. If a project only works at 85 per cent of cost, it is usually the feasibility that needs work, not the lender.
For a bank, almost always: commonly enough presales to cover the debt. For a non-bank, often not, or only a portion. Some private lenders need none at a lower loan-to-value and a higher rate. Fewer presales means more equity or more expensive money, never a free pass.
Presale contracts also have to be "qualifying": arm's length, with a real deposit, to buyers who can settle. A two-townhouse project on a suburban block in Melbourne's east can often go non-bank without presales if the equity is there; a six-unit site generally cannot. We will tell you which side of that line you are on before you pay for plans.
Indicatively, bank construction debt sits in the mid-sevens, institutional non-bank money around 8.5 to 11.5 per cent, mid-market non-bank 9.5 to 13, and short-term private senior debt 10.75 to 14 per cent, plus a 1 to 3 per cent establishment fee. Mezzanine and second-mortgage money runs well into the teens. All of those were quoted before the September 2026 rate rise.
Interest is usually capitalised into the facility and paid at the end from sales, which means it sits inside the loan-to-cost calculation. Line fees on undrawn money, QS inspection fees for each drawdown, and exit fees of up to 1 per cent are the other line items people forget. We put every one of them in the feasibility.
An independent quantity surveyor signs off the budget at approval and then certifies each builder claim against work done. The lender releases that amount, interest accrues on the drawn balance, and the cycle repeats until practical completion.
Cost overruns are the usual reason a development stalls, and the QS is your friend here: a lender will not fund a claim the QS will not certify. Keep a contingency of 5 to 10 per cent of construction cost in the budget, and keep it in cash or an approved contingency line rather than in hope.
A residual stock loan refinances the construction debt against the completed units, typically at 60 to 70 per cent of value from a bank or 65 to 80 per cent from non-bank and private lenders, interest-only for six to 24 months, with each unit released from the mortgage as it sells.
It is cheaper than extending a construction facility that has gone into default pricing, and it buys time to sell into a better market or lease up and hold. We plan the exit at the start, not at completion, because the exit is what every development lender is really pricing.
“The now is important, but what comes later is what really counts.”Suvidh Arora, 2022
The Cinch five steps, with the feasibility and the exit tested before the land settles.
Costs, GRV, equity and timeline. We stress-test the numbers and place the project with banks, non-banks or private lenders on the facts.
Valuation, QS report, lender approval. Land settles on the right facility so the construction draws can start without a refinance.
QS-certified drawdowns, practical completion, then sales or a residual stock loan. We stay across it to the last settlement.
Straight answers. If yours isn't here, ask cinchi (bottom right) or book a chat.
Funded, built, sold. A cinch.
I'm cinchi, Cinch Loans' AI assistant. I explain how Australian home loans and finance work, and when a question needs a current figure I check trusted sources like MoneySmart, Housing Australia, the RBA and the state revenue offices, and show you where it came from. Suvidh and the team give the actual advice. Your questions are saved so they can pick up where we left off, and when a question needs a person, I'll put you straight through on WhatsApp.
Conversation ref · pending
cinchi is an AI assistant. It can be wrong. Figures are quoted from the source shown and change over time. Nothing here is personal credit advice or an offer of credit. Credit Guide · Privacy · Talk to Suvidh