Home/Services/Development funding
Services · Development funding

From a duplex
to a site.

Small residential developments are funded against the project, not just your payslip: a bank will typically lend 60 to 70 per cent of total cost with solid presales, a non-bank 70 to 80 per cent with fewer or none, and a private lender more again at a higher rate. We work out which tier your project belongs in, what equity you need, and how the drawdowns, the QS reports and the exit fit together before you commit to the land.

What the market lends in 2026.

Indicative ranges for small-scale residential projects, from a single broker-platform guide checked this month. Every project prices on its own numbers.

60–70%Bank loan-to-cost on senior construction debt, usually with presales covering most of the debtFeasly guide, Aug 2026
70–80%Non-bank loan-to-cost, with presales anywhere from none to half the debtFeasly guide, Aug 2026
20–35%Equity contribution most non-bank and private lenders want as a share of total development costFeasly guide, Aug 2026
1–3%Typical establishment fee on the facility limit, usually capitalised into the loanFeasly guide, Aug 2026
12–24moUsual term on senior construction facilities, with an extension option; private money runs shorterFeasly guide, Aug 2026
4.60%RBA cash rate since 30 September 2026; floating facilities priced off bank bills have moved with itRBA

Figures checked October 2026 against the sources shown. Rules change; we re-check before every application.

How much can I borrow for a small development?

It depends on which lender tier fits the project. Banks lend around 60 to 70 per cent of total cost and 60 to 65 per cent of the gross realisation value, and want presales. Non-banks stretch to 70 to 80 per cent of cost with light or no presales. Private and stretch-senior lenders go further again, at a higher price. The rest is your equity, usually 20 to 35 per cent of cost.

Two numbers get confused constantly. Loan-to-cost is the loan against what the project costs to build, including land, construction, consultants and interest. Loan-to-value on GRV is the loan against what the finished stock will sell for, net of GST and selling costs. A lender tests both and lends to the lower result. If a project only works at 85 per cent of cost, it is usually the feasibility that needs work, not the lender.

Do I need presales to get development finance?

For a bank, almost always: commonly enough presales to cover the debt. For a non-bank, often not, or only a portion. Some private lenders need none at a lower loan-to-value and a higher rate. Fewer presales means more equity or more expensive money, never a free pass.

Presale contracts also have to be "qualifying": arm's length, with a real deposit, to buyers who can settle. A two-townhouse project on a suburban block in Melbourne's east can often go non-bank without presales if the equity is there; a six-unit site generally cannot. We will tell you which side of that line you are on before you pay for plans.

What does development finance cost?

Indicatively, bank construction debt sits in the mid-sevens, institutional non-bank money around 8.5 to 11.5 per cent, mid-market non-bank 9.5 to 13, and short-term private senior debt 10.75 to 14 per cent, plus a 1 to 3 per cent establishment fee. Mezzanine and second-mortgage money runs well into the teens. All of those were quoted before the September 2026 rate rise.

Interest is usually capitalised into the facility and paid at the end from sales, which means it sits inside the loan-to-cost calculation. Line fees on undrawn money, QS inspection fees for each drawdown, and exit fees of up to 1 per cent are the other line items people forget. We put every one of them in the feasibility.

How do progress drawdowns work on a development loan?

An independent quantity surveyor signs off the budget at approval and then certifies each builder claim against work done. The lender releases that amount, interest accrues on the drawn balance, and the cycle repeats until practical completion.

Cost overruns are the usual reason a development stalls, and the QS is your friend here: a lender will not fund a claim the QS will not certify. Keep a contingency of 5 to 10 per cent of construction cost in the budget, and keep it in cash or an approved contingency line rather than in hope.

  • Fixed-price building contract with a registered builder.
  • Planning permit, endorsed plans and a building permit before the first construction draw.
  • "To be constructed" valuation and a QS report at approval.

What happens when the build finishes and the units have not all sold?

A residual stock loan refinances the construction debt against the completed units, typically at 60 to 70 per cent of value from a bank or 65 to 80 per cent from non-bank and private lenders, interest-only for six to 24 months, with each unit released from the mortgage as it sells.

It is cheaper than extending a construction facility that has gone into default pricing, and it buys time to sell into a better market or lease up and hold. We plan the exit at the start, not at completion, because the exit is what every development lender is really pricing.

“The now is important, but what comes later is what really counts.”
Suvidh Arora, 2022

How a project gets funded.

The Cinch five steps, with the feasibility and the exit tested before the land settles.

01

Feasibility and tier

Costs, GRV, equity and timeline. We stress-test the numbers and place the project with banks, non-banks or private lenders on the facts.

02

Approval and land

Valuation, QS report, lender approval. Land settles on the right facility so the construction draws can start without a refinance.

03

Draw, complete, exit

QS-certified drawdowns, practical completion, then sales or a residual stock loan. We stay across it to the last settlement.

Development funding questions.

Straight answers. If yours isn't here, ask cinchi (bottom right) or book a chat.

01Is a duplex I will live in one half of treated as a development loan?+
Often not. If you will occupy one dwelling, lenders frequently treat it as consumer credit under the National Credit Code, with full serviceability rules rather than project-based funding. The structure changes the lender, the rate and the paperwork, so tell us the plan for the finished homes.
02Can I fund a development with no money of my own?+
Not realistically. Even private lenders want 20 to 35 per cent of total cost as equity, which can be land you own, cash, or in some cases a second mortgage over another property. Projects pitched with no equity are declined or priced in the high teens.
03How long does development finance approval take?+
Allow four to eight weeks from a complete pack: feasibility, permits, builder contract, valuation and QS report. Private lenders can move in days, which is partly what you pay for.
04Do you fund the land purchase before I have a permit?+
Yes, as a land or pre-development loan, typically 40 to 55 per cent of the land's current value. The construction facility comes later, once the permit and builder contract are in place.
05What is GST on a development and does the lender care?+
New residential sales attract GST, usually via the margin scheme, and the ATO withholding regime means the buyer pays part of the price to the ATO at settlement. Lenders calculate GRV net of GST and selling costs, so a $1 million sale is not $1 million of lender value. Your accountant structures it; we make sure the lender's numbers match.
06Are development loans regulated like home loans?+
Genuine business-purpose development lending generally sits outside the National Credit Code, so protections differ. Where any dwelling is for you or your family to live in, the loan is likely regulated and we treat it that way.

Often paired with.

All ten services →

Funded, built, sold. A cinch.